- Thin-layer decorative interior and exterior
- Steam-penetrating
- High adhesion
- User-friendly
- Frost resistant
- Waterproof
- Environmentally friendly
PREPARATION OF THE BASE:
The base shall be level, durable and dry, free from dust, dirt, lime, oils, fats, wax, oil residues and emulsion paints. The thinly held paint and plaster layers should be removed and the irregularities should be aligned with SCANMIX TT solution. The base should be treated with SCANMIX primer.
PERFORMANCE OF WORK:
The mixture is added to water and mixed mechanically until the required thickness of the solution is obtained. After 5 minutes, the finished solution should be mixed again. The solution retains its properties for approximately 4.5 hours. It is recommended to mix the solution from time to time in order to obtain a uniform mass. The plaster is applied to the prepared base by the thickness of the texture grain layer with the aid of a smooth stainless grater. The excess solution is removed and mixed in the bucket. The surface is either rotated, horizontally, or vertically, until the desired texture is obtained. The grater for ophacterization can be plastic or washing; in any case it is necessary to check on a separate area, which grater the master is more comfortable to make the texture «koroed». It should also be noted that offsetting occurs some time after verification of the first set (after the plaster surface has been saturated, the solution on the instrument must not remain).The time of open operation (the time between plaster application and solidification) depends on the absorption capacity of the base, the temperature of the environment and the consistency of the solution.
During plastering and drying, the treated surface must be protected from direct sunlight, wind and rain. Test (for this type of base and weather) the maximum surface that can be scaled in one production cycle(application and rubbing). The plaster must be applied by the method «wet on wet», not allowing drying of the shaded area until the next portion is applied; otherwise the joints will be visible.
Technological breaks are planned with reserve (for example: in corners, bends of buildings, under water pipes, at color junction, etc.). The drying time of the plaster depends on the basis, temperature and relative humidity of the air, and is approximately 12-48 hours. During plaster application and drying, the minimum ambient temperature shall be +5°С and the maximum temperature shall be +25°С. If the application of the solution is followed by subsequent colouring, it is necessary to wait 2-4 weeks.
The manufacturer shall not be liable for improper use of the material or its use for purposes and conditions not provided for in the instruction.
SAFETY PRACTICES:
Do not pour mortar and water into sewer pipes after work. It is advisable to wear rubber gloves. Avoid contact of the solution with the skin or eyes. If the solution enters the skin or eyes, it is necessary to wash it thoroughly with water, since the mixture contains cement which, when mixed with water, forms an alkaline medium.
SHELF LIFE:
In dry space and on pallets, in factory packaging: 12 months from the date of issue indicated on the package.
PACKAGE:
The dry mixture is packed in paper bags of 25 kg.
TECHNICAL CHARACTERISTICS:
COMPOSITION: Mixture of white cement with mineral fillers and special additives |
Color |
white |
Maximal grain |
2 mm |
Amount of water to mix solution |
0,16-0,25 l/ kg mixture |
Final solution time |
up to 4 o’clock |
Air temperature and bases when used |
up to +5 до +25°С |
Strength of adhesion to base |
not less than 0.6 megapascals |
layer thickness |
2 mm |
Frost resistance |
не менее 50 циклов |
Flow (depending on the thickness of the layer applied) |
|